An electrical panel may look unchanged from the outside while the risk inside it has changed significantly.

A new transformer, an added production line, revised breaker settings, replacement fuses or changes to the utility supply can all affect how much energy could be released during an electrical fault. If a facility’s arc-flash study and equipment labels no longer reflect those conditions, workers may be relying on outdated hazard information.

For industrial and commercial facilities, an arc-flash assessment is more than a label-making exercise. It is an engineering study that helps protect workers, supports regulatory compliance and identifies opportunities to reduce risk throughout the electrical distribution system.

What is an arc flash?

An arc flash is a sudden release of electrical energy through the air following an unintended electrical fault.

It can begin when a conductive path forms between energized components or between an energized component and ground. Possible triggers include:

  • Accidental contact with energized parts
  • Loose electrical connections
  • Insulation failure
  • Damaged conductors or busbars
  • Dust, moisture or conductive contamination
  • Corrosion
  • Equipment failure
  • Incorrectly selected or poorly maintained protective devices
  • Tools or other conductive objects contacting live components

Once the air becomes ionized, it can form a conductive plasma that allows a large amount of electrical energy to flow through the arc.

The result can include extreme heat, intense light, molten metal, fire, hazardous sound levels and a powerful pressure wave known as an arc blast. Temperatures within the arc can exceed 19,000°C, creating the potential for severe burns and extensive equipment damage in a fraction of a second.

Arc flash and arc blast are related but different

An arc flash primarily describes the thermal energy released during the event. That heat can cause serious burns, ignite clothing and damage equipment.

An arc blast is the accompanying pressure wave. It can propel tools, equipment components and molten metal through the surrounding area. Workers may also be exposed to hearing damage, eye injuries, falls, impact injuries and hazardous gases.

This is why arc-flash protection cannot be reduced to wearing fire-resistant clothing. The preferred approach is always to eliminate energized exposure where possible and use engineering, administrative and personal protective controls when it cannot be eliminated.

What is an arc-flash study?

An arc-flash study models a facility’s electrical distribution system to determine the potential severity of an arc-flash event at specific pieces of equipment.

The study typically evaluates:

  • Utility and transformer information
  • Available fault current
  • System voltage
  • Conductor sizes, materials and lengths
  • Breakers, fuses and protective relays
  • Protective-device trip settings
  • Fault-clearing times
  • Motor contribution
  • Equipment and enclosure configuration
  • Different operating configurations
  • Expected working distances

IEEE 1584 provides the recognized calculation models used to determine predicted incident energy and the arc-flash boundary. CSA Z462 uses this information within the broader framework of workplace electrical safety.

A complete assessment generally includes:

  • Electrical-system data collection
  • An updated single-line diagram
  • Short-circuit calculations
  • Protective-device coordination analysis
  • Incident-energy calculations
  • Arc-flash boundary calculations
  • Equipment-specific labels
  • PPE and risk-control information
  • Recommendations for reducing hazards
  • A professionally documented engineering report

What is incident energy?

Incident energy is the amount of thermal energy that could reach a worker at a defined distance from an arc source. It is measured in calories per square centimetre, or cal/cm².

The calculated incident energy helps determine:

  • The severity of the potential exposure
  • The arc rating required for protective clothing and equipment
  • The location of the arc-flash boundary
  • Whether the hazard should be reduced through engineering changes
  • Whether energized work can be performed under the facility’s electrical-safety procedures

A value of 1.2 cal/cm² is commonly associated with the onset of a second-degree burn. The arc-flash boundary identifies the distance at which a person could be exposed to that level of thermal energy.

The incident-energy value shown on a label is calculated at a specific working distance. Moving closer to the potential arc source can substantially increase exposure.

What affects the severity of an arc flash?

The severity of an arc flash is not determined by voltage alone. Two pieces of equipment operating at the same voltage can have very different incident-energy levels.

Several factors influence the amount of incident energy a worker may be exposed to, including:

  • Available fault current: How much current the electrical system can supply to the fault. This is affected by transformer capacity and impedance, conductor characteristics, generators, large motors and multiple power sources operating in parallel.
  • Clearing time: How long the breaker, fuse or relay takes to interrupt the fault. The longer the arc remains energized, the more energy it can release.
  • Working distance: The distance between the worker and the potential arc. Incident energy generally increases as the worker gets closer to the arc.
  • Enclosure size and configuration: The dimensions and construction of switchgear, MCCs, panelboards and other enclosures affect how arc energy is contained and directed. A smaller or more confined enclosure can concentrate energy toward the worker, while larger enclosures may allow the energy to spread differently.
  • Electrode configuration: The location and orientation of conductors or bus within the equipment affect the direction and behaviour of the arc.

This creates an important and sometimes misunderstood relationship. A location with very high fault current may still have lower incident energy if its protective device clears the fault extremely quickly. Conversely, a lower-current fault can produce dangerous incident energy when a breaker or relay takes longer to operate.

That is why breaker settings should never be changed without appropriate technical review. Adjusting a trip setting may affect coordination, equipment protection and the incident-energy levels shown on existing arc-flash labels.

Are arc-flash studies required in Manitoba?

Manitoba’s electrical-safety obligations come from several interconnected laws, codes and standards.

The Workplace Safety and Health Act places a general duty on employers to protect the safety and health of workers. Part 38 of Manitoba’s Workplace Safety and Health Regulation establishes requirements for electrical work, including safe work procedures and controls for energized electrical equipment. Manitoba Workplace Safety and Health Regulation

CSA Z462 is Canada’s principal workplace electrical-safety standard. It provides the framework for:

  • Electrical hazard risk assessments
  • Energized-work decision-making
  • Shock and arc-flash boundaries
  • Equipment labelling
  • PPE selection
  • Worker qualification and training
  • Electrical safe-work procedures
  • Maintenance of protective equipment

IEEE 1584 provides the calculation methodology used to determine predicted incident energy and arc-flash boundaries. IEEE 1584-2018

Manitoba also adopted the 2024 Canadian Electrical Code through Manitoba Regulation 30/2026, effective April 1, 2026. The new code includes arc-energy-reduction requirements for certain overcurrent devices rated 1,200 amperes or higher, together with supporting documentation requirements. Manitoba Electrical Code Regulation

The 1,200-amp threshold should not be interpreted to mean that smaller equipment presents no arc-flash hazard. It is a specific Canadian Electrical Code threshold for arc-energy-reduction provisions—not a universal boundary for whether an arc-flash risk assessment is needed.

Facilities must still evaluate the hazards workers could encounter when interacting with energized electrical equipment.

Does an arc-flash study have to be renewed every five years?

CSA Z462 requires the information supporting an arc-flash assessment to be reviewed for accuracy at intervals not exceeding five years.

The precise language matters: five years is the maximum review interval, not a guarantee that an assessment remains accurate for five years.

A full recalculation may not be necessary if a documented review confirms that the electrical system and relevant study inputs have not changed. However, the study should be updated sooner whenever changes could affect the results.

Examples include:

  • Adding or replacing a transformer
  • Installing a generator or alternate power source
  • Adding major motors or production equipment
  • Adding a new production line
  • Replacing switchgear, MCCs, breakers or fuses
  • Changing breaker or relay settings
  • Changing fuse sizes or classes
  • Modifying system operating configurations
  • Adding or changing tie breakers
  • Changing conductor sizes or feeder arrangements
  • Receiving revised utility fault-current information
  • Discovering that the single-line diagram is inaccurate
  • Completing a major facility expansion or renovation

If the conditions used in the original calculations have changed, the labels and PPE information may no longer represent the actual hazard.

A good facility practice is therefore:

  1. Review the assessment at least every five years.
  2. Review it whenever a significant electrical-system change occurs.
  3. Update the calculations, report, drawings and labels when the review identifies changes that could affect the results.
  4. Maintain documentation of the review, even when no recalculation is required.

What information is shown on an arc-flash label?

An equipment-specific arc-flash label allows a qualified worker to understand the hazard before beginning work.

Depending on the facility’s labelling approach and applicable requirements, the label may identify:

  • Equipment name or identification number
  • Nominal system voltage
  • Arc-flash boundary
  • Available incident energy at the stated working distance
  • Minimum arc rating of required PPE
  • Shock approach boundaries
  • Required glove class
  • Study or label date

The equipment identification should correspond with the facility’s single-line diagram and study database. This allows workers to trace the equipment back to the engineering calculations and applicable protective-device settings.

A label is only reliable when the system behind it still matches the study.

How does an arc-flash assessment benefit a facility?

The most immediate benefit is worker protection, but the study can also provide significant operational value.

An arc-flash assessment can help a facility:

  • Select PPE based on calculated hazards rather than assumptions
  • Establish defensible energized-work procedures
  • Identify equipment with unusually high incident energy
  • Locate protective devices with excessive clearing times
  • Verify whether breakers and fuses have adequate interrupting ratings
  • Improve protective-device coordination
  • Reduce the area affected by a fault
  • Prioritize maintenance and equipment upgrades
  • Improve single-line documentation
  • Prepare for insurer, corporate and safety audits
  • Reduce exposure to equipment damage and unplanned downtime

The study may also identify ways to reduce the hazard itself. Possible mitigation measures include adjusting relay settings, improving protective-device coordination, enabling maintenance-mode settings, installing current-limiting protection, replacing slow or obsolete breakers, changing system configurations or introducing remote operation.

The objective is not simply to prescribe heavier PPE. Where practical, engineering should reduce the amount of energy released or remove the need for energized exposure.

Is your facility’s study still accurate?

Facility leaders should be able to answer the following questions:

  • When was our last arc-flash assessment completed or formally reviewed?
  • Does it reflect the current electrical system?
  • Have transformers, generators, production equipment or protective devices changed?
  • Do our single-line diagrams match actual field conditions?
  • Are all applicable panels, MCCs and switchgear correctly labelled?
  • Can we connect every label to current engineering calculations?
  • Have protective devices been maintained and tested?
  • Do qualified workers understand the labels, boundaries and PPE requirements?
  • Do our energized-work and lockout procedures reflect current conditions?

If the answer to any of these questions is unclear, the facility may have a gap between its documented electrical-safety program and the system that exists today.

From assessment to implementation

An arc-flash assessment should produce more than a report stored on a shelf. Its findings should inform labelling, training, maintenance, work planning and risk-reduction projects.

MAKA Engineering combines professional engineering with MAKA Power’s electrical testing, maintenance and field-execution capabilities. This allows our team to support the complete process—from system data collection and engineering analysis to labelling, mitigation, testing and implementation.

If your facility has never completed an arc-flash assessment, is approaching the five-year review point or has changed since its last study, now is the time to confirm that your documentation still reflects your actual electrical system.

Your Power. Our Purpose.

This article provides general educational information and is not a substitute for a facility-specific engineering assessment or legal advice.

Your power. Our purpose.

One Partner. Every Solution.

Whether you're dealing with recurring electrical issues, planning for growth, or looking to improve reliability, we're here to help you reduce risk, avoid downtime, and make more confident decisions.